A maximum number of 16 mains synchronizing controllers may coexist on the same Datalink bus. The mains synchronization functionality is used to synchronize a genset group to the power grid. Gensets are put in parallel on the same busbar.
This project includes 3 X 1350 kVA Perkins engine gensets with 3 mains was realized by Emsa Generator.