Home | References | MULTIPLE GENSET SYNCHRONIZATION with MAINS in THE MALDIVES
MULTIPLE GENSET SYNCHRONIZATION with MAINS in THE MALDIVES ( by API )
Location: The Maldives

A maximum number of 16 mains synchronizing controllers may coexist on the same Datalink bus. The mains synchronization functionality is used to synchronize a genset group to the power grid. Gensets are put in parallel on the same busbar.

This project includes 5 X 500 kVA gensets with 2 mains was realized by Asian Power Investment company.

Return References